Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. In the Report Gallery tab, hover over the report to run.
  2. Under the report's thumbnail, click the Run link. 
  3. In the Device Groups list, click the group name or click several groups holding the Ctrl key.
  4. Note: To To select one or more devices from any a device group for the report run, click the Devices tab. Click Next.Select a device group, and then click the plus icon for a specific device or devices. 
  5. If available for the report you are running, choose the initial Date for the period covered by the report.
  6. From the Period drop-down list, choose the time period to be covered by the report.
  7. Click Run.

...

  1. In the Report Gallery tab, hover over the report you want to schedule.
  2. Under the report's thumbnail, click the Schedule link. The report scheduling wizard opens.
  3. Specify the device group(s) to be covered by the report. To select a group in the Device Groups list, double-In the Device Groups list, click the group name or click several groups holding the Ctrl key.
    To deselect a group, click the group name again.
  4. To deselect a group in the Selected Device Groups list, double-click the group name. Click Clear to remove all groups from the Selected Device Groups listselect one or more devices from a device group for the report, click the Devices tab. Select a device group, and then click the plus icon for a specific device or devices.
  5. Click Next.
  6. Change the Report Name as needed.
  7. The To Emails field is pre-populated with a default e-mail address, which can be changed. You can enter multiple e-mail addresses (each address must be separated with commas).
  8. The To Users field is pre-populated with e-mail addresses for all NetMRI users. You cannot edit this list.
  9. Select an Output Format.
  10. Specify a Recurrence Pattern, then select scheduling options as shown for the recurrence pattern.
  11. Click Next.
  12. Review the scheduled report specifications. Click Previous to return to steps needing to be revised.
  13. If the specifications are correct, click Schedule. The job is listed in the Scheduled Reports tab.

...