Document toolboxDocument toolbox

Managing Scheduled Reports

To copy a scheduled report job, click the Copy button, enter a name for the report, and then click OK.

To edit a scheduled report job, do the following:

  1. Click Edit. The Report Scheduling Wizard opens.
  2. As needed, change report parameters.
  3. Review the scheduled report specifications, then click Schedule.
    • To run a scheduled report now: Click Run Now.
    • To delete a scheduled report: Click Delete, then confirm the deletion.